Know Your Spends

Cost Calculator

We are here to help you

Frequently Asked Questions

Nothing. In effect, all that will happen is that your roof will get an additional layer and will be more protected from the elements.

We have flexible payment plans ranging from Capex (Upfront investment), OPEX / BOOT (Pay as you use) to Lease.

No we don’t. We source panels from Tier -1 manufacturers globally.

Net Metering: Under this framework, the energy generated from the rooftop system is first used internally (by the rooftop owner’s facility to meet internal loads) and the excess is exported to the grid only to be netted out against energy imports at other times.

Gross Metering : Under this framework, all the energy generated from solar rooftop systems is exported to the grid with no internal consumption at the rooftop owner’s facility. The FIT denotes the price paid by the utility for the solar power from the rooftop.

We design systems to last beyond 25 years.

In most cases, roof modifications are not required. We will assess your roof and, when confirmed suitable, will make all the arrangements ourselves.

The solar panels have a warranty for a period of 25 years, however, the projected life is longer.

The evacuation of solar power happens in the LT room, in most cases at 415 V.

Since Solar PV works on the basis of the intensity of sunlight it gets, your solar system typically wakes up at around 6am in the morning and goes to sleep at about 6 or 7pm in the evening. The energy output increases gradually and peaks at around noon and then gradually decreases as the sun starts setting.

We will install a meter at the “injection point” where the power generated from the system will be injected into your electrical system. The generation data shall also be visible online through the web portal and mobile application.

Solar systems do not weigh much and usually this is not an issue. In all cases, Powerhut India’s Team will ask you for the technical information about your roof structure in order to make an assessment.

Yes, we do provide an app or web-based link that can be used to see the up-to-date performance of your system.

Solar modules (panels) and inverters are the main components of a solar power system and they constitute 70% of project cost.

 

1 kWp solar system requires approximately 10 sq. m (or 100 sq. ft) of shadow free area. Therefore, one 1 MWp (1000 kWp) solar system would require 10,000 sq. m / 1,00,000 sq. ft / 3 acres of shadow free area.

Yes, wind load is considered. The wind load will depend upon the exact location. The installer should consider IS standards for the specific location. But solar power plants can be designed for any wind load.

Solar photovoltaic panels have no moving parts, and therefore require little maintenance, which will include module cleaning with water every 2-4 weeks and preventive electrical maintenance every 3 months.

A 1 MW plant will generate around 15 lac units in the first year. The exact power generated will be subject to the location of the solar power plant.

Yes, the power produced will degrade by up to 2.5 % in the first year and up to 0.5 -0.8 % during each of the following years. In the 25th year, the solar system will still produce 80-90% of the energy produced in the 1st year.

Let us discuss together!

Have Any Questions?

Our vision is to build sustainable solar infrastructure that will power the aspirations of institutions and businesses for generations.

We are making this world a better place to live in, one solar plant at a time.

Feel free to share your ideas, discuss your project or ask a query! we would be glad to assist you.

Get in Touch!

Ready to explore solar for your home or business? Fill out the form below for a free consultation!